Vulcan 1ER50A Manuel d'utilisateur Page 7

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 32
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 6
ERA & EBD SERIES ELECTRIC FRYERS - REMOVAL AND REPLACEMENT OF PARTS
3. Remove element head cover as outlined under
COVERS AND PANELS.
4. Disconnect temperature probe lead wires.
5. Remove temperature probe from the element
head.
6. Reverse procedure to install.
NOTE: When installing, ensure grommet remains in
place when inserting temperature probe thru the
grommet in the element head.
7. Check cooking control calibration as outlined in
COOKING CONTROL CALIBRATION under
SERVICE PROCEDURES AND
ADJUSTMENTS.
HIGH LIMIT THERMOSTAT
Do not sharply bend and kink, or clamp
down on the capillary tube or damage may occur.
1. Raise heating elements.
2. Loosen clamps securing capillary tube and bulb
to element.
3. Remove element head cover as outlined under
COVERS AND PANELS.
4. Remove high limit from mounting bracket.
5. Disconnect high limit lead wires.
6. Remove grommet from the element head
assembly.
7. Remove the bulb, capillary tube and high limit
from the element head assembly.
8. Reverse procedure to install.
A. Slide grommet onto capillary tube then
insert grommet into the capillary tube thru
hole in the element head.
B. Move element lead wires clear of high limit
when installing.
F25385 (May 2010)Page 7 of 32
Vue de la page 6
1 2 3 4 5 6 7 8 9 10 11 12 ... 31 32

Commentaires sur ces manuels

Pas de commentaire