Vulcan VSX3E Manuel d'utilisateur Page 32

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 40
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 31
VSX SERIES STEAMER - ELECTRICAL OPERATION
Page 32 of 40
DELIME CYCLE
1. Steamer is in a cook cycle where the delime
board monitors the cook time.
2. Delime light comes on.
A. Cook cycle ends and product removed.
3. Power switch turned to delime position.
4. 3K energized.
A. Contacts 3K-1 NO close.
B. 1M energized and drain closes.
C. Delime board transformer energized.
D. Contacts 3K-1 NC open.
E. Contacts 3K-2 NO close.
1) Delime time is reset to 0".
5. Turn steamer off and perform delime procedure.
GAS MODELS
INITIAL FILL & PREHEAT
1. Conditions.
A. Unit connected to correct voltage.
B. Supply water valve "on".
C. Gas supply valve on.
D. Power switch "off".
E. High limit thermostat closed.
F. Control Thermostat closed.
G. Drain open and tank empty.
H. Door closed.
I. Timer "off".
J. Tank and WLC properly grounded (share
common ground).
2. Power switch turned "on".
A. L1 (120VAC) to one side of 1M; Pin 11,
WLC; 1SOL, 1K; 2K; 2LT; 2SOL; BUZZER;
TM; 1T which in turn supplies 24VAC to one
side of Ignition Module, TH, 4LT and Gas
Valve.
B. NEUTRAL (120VAC) to one side of 1M,
drain motor; pins 4,8 & 12 of water level
control.
1) 1M drain motor energized; drain valve
closed.
2) 1SOL energized thru HL-2; Water flows
to tank.
3. Water reaches LLCO probe.
A. LLCO energizes.
1) Contacts LLCO-1 open; LLCO-2 close.
2) LLCO LED lights.
4. Water reaches LL (Low Level) probe.
5. Water reaches HL (High Level) probe.
A. Internal relay HL energize.
B. HL LED lights.
C. Internal relay coil HL locks through HL-1.
6. 1SOL de-energized; water flow off.
A. After the initial fill, the water level is
maintained by 1SOL being energized when
the water level drops below the LL probe
and being de-energized when the water
level reaches the HL probe. This will not
affect operation of either the preheat or
cook cycle due to 1K being energized and
locked during the initial fill.
B. 1K energized and locks 1K coil when 1K
NO/C close.
C. 2K energized thru 2TAS, 1K-NO/C, WLC-
LLCO-2.
D. Ignition Module energized thru 2K-2 NO/C,
2TAS, 1K-NO/C, WLC-LLCO-2.
7. After the ignition module is energized, ignition
trial cycle begins.
A. Module purges for 5 seconds to allow time
for any residual gas to dissipate. After purge
time elapses, HSI begins a 3 second heat
up time.
B. When HSI heat up time elapses, the gas
solenoid valve opens to supply gas to the
hot ignitor.
C. Burner will light, flame sense probe detects
flame, HSI de-energizes after an 8.5 second
ignition trial time, gas valve stays open and
heating begins.
8. Tank temperature reaches set point.
A. 2TAS opens.
9. 2K de-energized.
A. Ignition Module de-energized.
1) Burners off.
B. 1LT ready light energized, indicating tank is
at hold temperature. 1LT uses bleed through
voltage.
10. Tank temperature drops below set point.
A. Tank temperature is maintained by the
burners cycling with control thermostat
2TAS until time is dialed on the timer, water
level drops below the low level cut-off probe
or the power switch is turned off.
B. 1LT ready light goes out.
11. Water level drops below LL probe.
A. Internal relay HL de-energized, contacts HL-
1 open; HL-2 close; HL-3 open.
1) Power is removed from the heating and
cooking circuits.
Vue de la page 31
1 2 ... 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Commentaires sur ces manuels

Pas de commentaire